Project greenhouse all but complete except for waiting for 2 replacement sheets of toughened glass next week. One just shattered as I touched it. Otherwise all glass fitted now, and am I glad it has been a very long journey. Don't want to do it again ever , this one was a real headache
Before Taken down Rough foundation then sharp sand/cement over this below Slabs laid Path extended Finished apart from getting replacement brokewn glass panels (2) 30/40 bags of rubble removed at taken to council tip too many trips to even cont as allowed only 6 bags a month so we went to 2 tips Hastings and Eastbourne East Sussex. Also an8x4 trailer full of wood. The roof tiles in pic1 each on was screwed into the battens with 2 screws, the previous owner over engineered everything
I think it is a well done job. It is always been harder to repair a condition that has long been there, the easier it is to make something new.